Answer / fred
Let us say:
Electricity unit=kwh
Cost = USD/m3
Assuming:
Your Mixing Concrete Plant can produce 100m3 in 1hrs and the consumption electricity is 10 kwh, the cost per kwh is 10 USD.
Therefore:
100 m3/hr = 100 USD
| Is This Answer Correct ? | 0 Yes | 1 No |
What is the difference b/w relay and contactor?
What environmental controls?
what is PIV related to diode
why we use log files in QTP?
Where is the catting plane line located when a section view is in dicated?
What is fauit level
ANY ONE USED/INTERFACED CITECT VERSION 6.0/1 OR 7.0/1 TO SIEMENS S7-300 OR S7-400 CONTROLLER IF PLEASE TELL ME THE COMMUNICATION STRUCTURE AND ADDRESS CONSIDERATION FOR DI,DO,AI,AO please mail the details lok_pallapolu@yahoo.com Ph:09247513753 hyderabad
What are the three managerial functions? Explain.
how to differentiate a mpcb,mcb with contactors via working principle Explain the working principle of MPCB,MCB & Contactors
We will import machihery. how we will take input
0 Answers Balsara Engineering Products Private Limited,
How three wire proximity can be used in place of two wire proximity?
EXPLAIN WHY YOU CONSIDER YOURSELF SUITED FOR THIS POSITION:
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)