What effect does choking a vertical thermosiphon have on the heat transfer rate?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Chemical Engineering Interview Questions

Question 94 - The resolution of separation, Rs for chromatography is given by the formula Rs = (difference in retention time) / (average width at the base). In a chromatogram, 3 peaks a, b and c are found. Average widths W at the bases of the solutes are : Wa = 20 s, Wb = 40 s, Wc = 30 s. Resolutions of separation, Rs for solutes b and c in comparison to a are 2 and 4 respectively. The differences in retention times T for b and c in comparison to a are (Tb - Ta) and (Tc - Ta), Ta = Tc - Tb : (a) Form 2 equations involving Rs as a function of Wa, Wb, Wc, Ta, Tb and Tc. (b) Find the values of Ta, Tb and Tc.

1 Answers  


how to reduce COD from plant waste water closed circulation system

1 Answers  


Explain the some guidelines for sizing a psv for a fire scenario on a vessel in a refinery service?

0 Answers  


how to calculat suction head in centrifugal pump?

2 Answers   IOCL,


Explain how can one estimate how the friction factor changes in heat exchanger tubes with a change in temperature?

0 Answers  






What fluid first to be lined up in a heat exchanger whether hot or liquid?why?

2 Answers   TCL,


what is chemical engineering?

2 Answers  


when selecting psv(pressure safety valve),what are all things we have to keep it in mind?

4 Answers   Qasco,


Explain the difference between cfm (cubic feet per minute) and scfm (standard cubic feet per minute)?

0 Answers  


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.28 : In the development of a small engineering facility for biochemical processing, completed contract method is applied in its construction accounting. In a short contract period, let the (contract price) = A. Let the (costs to date) = B; (estimated cost to complete) = C. (a) Find the values of : (i) estimated total costs; (ii) total estimated profit; (iii) percent completion to date. (b) If the project contract is 100 % completed : (i) find the total gross profit recognized; (ii) what is the exact numerical value of C?

1 Answers  


Question 103 - (a) Let | - > = 1 | x > + 0 | y >, | | > = 0 | x > + 1 | y >. Find the value of 2 | x > + 3 | y > in term of | - > and | | >. (b) Let m to be the reduced mass. Find the value of m in term of Ma and Mb where 1 / m = 1 / Ma + 1 / Mb.

1 Answers  


can u tel me d question paper of gail?

0 Answers   HPCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16636)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)