How do you handle change requests ?
Answers were Sorted based on User's Feedback
Answer / nagasundar subramanian
We need to follow following list of process while CR comes
up,
1. Feasibility Study
2. Impact Analysis (based on Tracability Matrix if exists)
3. Estimation (will be affected if the client have chances
to provide further)
4. Implementation
5. Testing (should be careful about existing functionality)
6. Deployment and Deliverables
Hope you enjoing with my answer
Thanks,
Nagasundar Subramanian
| Is This Answer Correct ? | 18 Yes | 1 No |
Answer / megha
I agree with Subramanyam fully
and also I want to add some more points to that
1. if CR is small (<4) then Project Manager can assign to
some developers to work on this
2. If CR is Major then it has to be approved by the Change
control board (Statke holders)
3. CI form should be sent to the client and needs his
approval
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / akki
Once CR is identified, Need to do Feasibility Study, impact
analysis & estimation. Then most important thing is approval
on CR is required from the concern stakeholder( can be SCB
also).
Post approval design( if required for major CR),
development, test plan -test cases preparation, unit test,
integration test.
Finally it needs to go in UAT for acceptance.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / naveen verma
A CR is raised, followed by TIME and COST. Finally, need to
agree on some date and then carry on with usual process.
| Is This Answer Correct ? | 4 Yes | 6 No |
How do you estimate the effort for your project? Where is the estimation procedure documented?
Test the save dialog in Notepad?
How do you handle change requests ?
What is the document that should be consulted to know about your project, the activities you do, your schedules and milestones?
What are various life cycle model in S/W development ?
create a flow diagram up to 2 levels for hospital management
Where and how are the risks associated with your project identified and documented?
Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance
How do you track the technical activities in your project? How is the status of the project communicated to the team?
Write a function that will return the number of days in a month (not using System.DateTime)?
Write the test cases for a vending machine?
funds flows analysis how to prepare for interview