What are the different phases of SDLC ?
Answers were Sorted based on User's Feedback
Answer / sanjay sajwan
SDLC PHASE:THE SEVEN PHASE OF SDLC ARE:
1)FEASIBILITY STUDY:
a) Need Analysis
b) Operational
c) economic
d) Technical
e) evaluation of alternative
2)Analysis
a) current system
b)Requirement of new system
3) Design
4)coding
5) Teasting
6)Implementation
7)Maintanances
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sonali
7 phases-
1.Recognition of need
2.Feasibility study
3.Requirement analysis and specification
4.Software design
5.Coding
6.Testing
7.Delivery and Maintenance
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / surabh bade
1: Preliminary analysis: The objective of phase1 is to
conduct a preliminary analysis, propose alternative
solutions, describe costs and benefits and submit a
preliminary plan with recommendations.
2: Conduct the preliminary analysis: in this step, you
need to find out the organization's objectives and the
nature and scope of the problem under study. Even if a
problem refers only to a small segment of the organization
itself then you need find out what the objectives of the
organization itself are. Then you need to see how the
problem being studied fits in with them.
3: Propose alternative solutions: In digging into the
organization's objectives and specific problems, you may
have already covered some solutions. Alternate proposals may
come from interviewing employees, clients , suppliers,
and/or consultants. You can also study what competitors are
doing. With this data, you will have three choices: leave
the system as is, improve it, or develop a new system.
Describe the costs and benefits.
4: Systems analysis, requirements definition: Defines
project goals into defined functions and operation of the
intended application. Analyzes end-user information needs.
5: Systems design: Describes desired features and
operations in detail, including screen layouts, business
rules, process diagrams, pseudocode and other documentation.
6: Development: The real code is written here.
7:Integration and testing: Brings all the pieces together
into a special testing environment, then checks for errors,
bugs and interoperability.
8:Acceptance, installation, deployment: The final stage
of initial development, where the software is put into
production and runs actual business.
9: Maintenance: What happens during the rest of the
software's life: changes, correction, additions, moves to a
different computing platform and more. This is often the
longest of the stages.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / umme hani farooq
SDLC STEPS:
1 Problem definition
2 Data Collection
3 Analysis of system alternatives
4 Development of system proposals
5 Pilot or prototype
6 System design
7 Program Development
8 System implementation
9 System evaluation and support
~*~^"bEst Of LucK"^~*~ :)
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nitin raval
SDLC is performed in two steps.
1. System Analysis and
2. System Design
System Analysis involves:
1. Problem Identification
2. Feasibility study and cost benefit analysis
3. System requirement analysis
System Design involves:
4. System design specifications and programming
5. System implementation, follow up and maintenance
6. Evaluation of the system
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / priya saini
There are basically 6 phases of SDLC
1.Project Planning.
2.Requirement Analysis.
3.Designing.
4.Coding.
5.Testing.
6.Maintenance.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / lokesh barani
Phases in SDLC are
Planning
Analysis
Design
Implementation
Maintenance/Sustainment/Staging
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rose mary
i think this answer is correct because it show u the steps
for people who want to develop thier skills and change the
life cycle dependin on how it is created!!!
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / rose mary
this is true because it helps u know more about computer
technology.
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / syed asad anwer
1) preliminary Investigation
2) Problem Analysis
3) Requirements analysis
4) Decision analysis
5) Design Phase
6) Construction
7) Implementation
| Is This Answer Correct ? | 2 Yes | 3 No |
Given a MAKEFILE (yeah a makefile), design the data structure that a parser would create and then write code that iterates over that data structure executing commands if needed.
Q1. A. How can we determine performance standards? B. Write note on chaining views. Q2. A. Discuss the working with task in Gantt chart view. B. Explain the creation project schedule. Q3. A. What is understand in resource tracking? B. Write short notes on Caturing Baseline. Q4. A. How to customize workgroup message? B. How to use hyperlink? Q5. A. Explain the installation of project server? B. Discuss the working with to-do lists. Q6. A. Explain the working of templates? B. What is visual basic? C. Write shortnotes on user forms.
How do you create the Software Project Management Plan (SPMP)?
Write a function that will return the number of days in a month (not using System.DateTime)?
How do you write unit test cases ?
6 Answers College School Exams Tests, Microsoft,
I want question and paper based MS Projects. Also is there any exam which microsoft conduct for Ms Project professional to issue certification?
How do you rate yourself in c#,vb.net,Asp.net,oracle,sql server ?
0 Answers 3i Infotech, Choice Solutions, iGate,
About current project architecture ?
How are the team members kept informed about the current status of the project?
create a flow diagram up to 2 levels for hospital management
Scenario: -------- -- You are a project manager in a large software house of 375 staff in total. The company has been running for 5 years. The company has been CMM assessed at level 3. The company has many external clients for whom it develops a wide range of business applications. -- Most of the company‘s applications are developed in Java. The waterfall lifecycle development model is normally used in developments. -- The company has historically suffered from the type of problems that are common in the software industry. In particular systems have been delivered not always to user requirements and containing faults. The managing director of the company is very keen for improvements to be made in these areas. -- You are in charge of a project team of 8 developers, 2 requirements engineers and 3 testers. Your team is just about to start a new development. System to Develop :( Exact Question ) ------------------------------------- -- Your team is about to start to develop a novel vehicle navigation system for physically impaired drivers. The navigation system not only identifies the correct route for the driver in the normal way, but also controls the steering wheel to navigate the car to the destination identified by the driver. -- A basic statement of requirements has been received from the customer and budget and timescales have been formalised into a contract. Requires TASK to write : ------------------------ -- You must write a short report (maximum of 1 page) for the managing director of your company outlining how you propose to ensure that this project improves on previous projects in terms of delivering to user requirements and without faults. Your report must include how you propose to show improvement on these issues to your managing director. Also please tell me how should I choose the best software model when given scenarios like these ...?
How would you deal with a bug that no one wants to fix? Both the SDE and his lead have said they won?t fix it?