Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the angle of degree suspended when two hands of clock showing the time 2.30.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More General Aptitude Interview Questions

Why 3 comes after 2 And 2 comes after 1 ?

8 Answers  


There are two candles of equal lengths and of different thickness. The thicker one lasts of six hours. The thinner 2 hours less than the thicker one. Ramesh lights the two candles at the same time. When he went to bed he saw the thicker one is twice the length of the thinner one. How long ago did Ramesh light the two candles .

25 Answers   3i Infotech, Canara Bank, Geodesic, Interlace, John Deere,


if for h hours of work the salary is s and the employee gets x hours of medical leave, then what is the salary/hr ?

0 Answers   TATA,


Hi, I am appearing for the Ministry of renewable sources exam for the post of Scientist B to be held on 28th June,09. Can anyone help me regarding the same? If anyone could share your experience or sample papers in this regard & general aptitude papers for the same at shobha_28@rediffmail.com/ laxmi383@gmail.com . It would be very useful for me. Thanks

0 Answers   DOT,


A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.

0 Answers   Wipro,


A printer produced 176,400 pages in a given day. If the printer was in operation for seven hours during the day, how many pages did it print per minute?

0 Answers   Cap Gemini,


A 16 stored building has 12000 sq.feet on each floor. Company A rents 7 floors and company B rents 4 floors. What is the number of sq.feet of unrented floor space.

8 Answers   TCS,


there is a 4 inch cube painted on all sides. this is cut into no of 1 inch cubes. what is the no of cubes which have no pointed sides.

0 Answers   InfoTest,


Please send me previous years Bank's PO Examinination question paper or model question papers to my mail id ravi77.bdm@gmail.com Kindly do the needful Thanks, Ravi

0 Answers  


Which of the following does multithreading allow? A. several transactions that require the same program to use one copy of the program. B. many tasks to be allocated to the terminal. C. an audit trail of all files records from all files updated by a particular application

0 Answers  


Three men A, B, C can complete a work separately in some specified days (May be 8, 7, 6).If they do the work together by alternate days. Then how many days need to complete the work?

0 Answers   Accenture,


In a flight of 600 km, an aircraft was slowed down due to bad weather. Its average speed for the trip was reduced by 200 km/hr and the time of flight increased by 30 minutes. The duration of the fligh is?

1 Answers  


Categories