In China, Mao-Tse-Tung was responsible for organizing its people and taking China into success path. It evolved into a great economic power by improved industrial and economical statistics. China prospered in those years, but _________________
No Answer is Posted For this Question
Be the First to Post Answer
If a car starts from A towards B with some velocity due to some problem in the engine after travelling 30km.If the car goes with 4/5 th of its actuval velocity the car reaches B 45min later to the actual time. If the car engine fails ofter travelling 45km, the car reaches the destination B 36min late to the actual time , what is the initial velocity of car and what is the distance between A and B in km ans) 20 &
electrical question in diploma level
what is calander and do make it.
Modulo(373,7)+round(5.8)+truncat(7.2)-round(3.4)=
In a grass field, If there are 40 cows, they could eat for 40 days. If there are 30 cows, they could eat for 60 days. Than if 20 cows, How much day they could eat? a) 60 b) 80 c)55 d)50
32 Answers IBM, Reliance, TCS,
A can do a piece of work in 20 days.B can do the same in 15 days.they both together work for 6 days,then B is replaced by C who works with A for next 4 days & finished it.in how many days C alone can do the same work?
Integral B(Transpose)*sigma(here sigma means stress)*dV REPRESENTS?
There are two glasses A and B. A contains orange juice and B contains apple juice in same quantity. Some amount orange juice from glass A is transferred to glass B. The juice in glass B is mixed well. Then again the same amount of juice from B is transferred to A. Compare the quantities of apple juice in A and orange juice in B.
Difference between equity and preference shares
If today is Saturday, what day will be 500 days from today?
a clock which gains uniformly was observed to be 5min slow at 12 noon on monday. it was noticed 10 min fast at 6pm . on the next day .when did the watch show the correct time (* PLEASE GIVE THE EXPLANATION*)
A can do a piece of work in 15 days, which B can do in 10 days. B worked at it for 8 days. A can finish the remaining work in
11 Answers RRB, SSC,