Study the attached ACS 790 AHU and boiler GUI and refer to the video on the software usage, catalog and the step by step document (page 9) to perform the following task:
List in a table form the controllers and all their connected I/O for the boiler and the AHU.
No Answer is Posted For this Question
Be the First to Post Answer
"In steam boiler, what are the various test in water boiler?"
1 Answers ABC Inc, RRB, Siemens,
DO WE HAVE NEGETIVE MARKING FOR APPSC(ASST MOTOR VEHICLE INSPECTOR EXAM WHICH IS GOING TO BE CONDUCTED ON 16/6/2013
what is the equvalent indian material code for EN10025/2- S75JR
What will happen if oil is mixed with boiler feed water?
What is the difference between "stress and strain”?
where is the steam trap connected in boiler distribution?
What is the difference between Mild Steel and Cast Steel with full chemical composition and application details.
Why do we use solid shafts for transfer of power in case of pumps/ turbines & other machines why we use a hollow shaft (pipe) in universal joints of automobiles; although the rated load and twist is approx. the same?
how to work on angular contact bearing? And which type load it take.
Why are lng pipes curved?
What is a converter reactor ?
HOW MUCHSTACK EMMISSION THROUGH YOUR CHIMNEY AND WHAT IS THE STATE GEVINORMS
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)