Please help me regarding my one concern.
- During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

WHAT IS THE MEANING OF 'UPF'&'LPF'.... HOW CAN WE DEFINE IT? WHAT IS THE VALUE/RANGE OF EARTH WIRE RESISTANCE USED PARTICULARLY IN HOME....

2 Answers  


why plc need seprate earthing?

2 Answers   ABB, Whirlpool,


How to calculate the ups battery back up? give the formula.

15 Answers   Cushman Wakefield, Ethio Telecom, Exide, MacLellan, Morgan Stanley, TATA,


What are the types of Bus bar?

8 Answers   CTEVT,


How to calculate or testing the KW in generator

1 Answers  






what is difference between sub-station and switch yard.

16 Answers   Bhel, Ravate,


The loads are connected with phase and ground then why current flow as the loads ?

0 Answers  


what is the significance of terminal voltage and phase sequence in the operation of paralleling of two generators?

0 Answers  


What is the exact load current needed for a place which has 100nos of bulb of each 100w?

2 Answers  


what are the pecularity of shaver sockets ?

0 Answers  


Dear sir, In our plant have Station Transformer having capacity,i want to know, why LV side 40 - 40MVA is given? & how we can get 6.3 KV supply from tertiary(i.e. Open delta connection), Vector Group YNyn0 - yn0 +d MVA Rating 80MVA / 40 - 40MVA + 26.7MVA Voltage rating 420 (Tap range +6,to -10)81.25% /11.5KV - 11.5KV +6.3KV

0 Answers   Bhel,


Do you have any P.L.C in your organization?

12 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)