Please help me regarding my one concern.
- During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
No Answer is Posted For this Question
Be the First to Post Answer
When steam condenses and becomes water at the same temperature, the specific heat for the process in kJ/kg k is
which type of amplifiers are used in multimete?
why transmission voltage is 230kv and not 220kv which is a multiple of 11
1 Answers Mettur Thermal Power Station, Siemens,
what is pmu
1amps current equal to howmany electrons to be flowed?
what happens if i connect acapacitor to a generator load
What is the voltage b/w nutral and earth
Shall we get electrical shock if we touch the positive terminal of a 230 volt dc supply?
What is the method of Tan delta test for power Transformes and why it is required.
advantages of vvvf drives over non vvvf drives for EOT cranes
define main transformer?
what is the sweep commenly used 1200mm sweep and 600mmsweep please tell me breifly sweep
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)