how many bricks required for below volume 1. depth filling 0.00 Qty 1.61 & Unit Cu.M
2. D-Filling 300 Qty 2.0 & Unit Cu.M 3. D.Filling 450 Qty 2.24 & Unit CU.M 4. D-Filling 600 Qty 2.44 & Unit Cu.M
Floor tile measurement? Wall to wall or skirting to skirting
how to calculate the number of bricks for 10'x10' wall?
Concrete could be defined as, (1)An artificial stone (2)Structural stone (3)Strong stone (4)Rock and Sand stone
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
what are all the new civil construction materials?what are the new concepts ?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
0 Answers Civil Service, Intelinet, Marg, PMC,
What is the difference between Grade I, II and III of GSB?
in construction feild make the column rods are uneven ( e.g 1 column we have 6 nos of bars that 6 nos of bars are varrious level- 1 bar 10';2 bars 9';3 bars 8') what is resion to put different level if difference are required or not?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
0 Answers GKC Projects Limited GKCPL,
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
16 Answers Reliance, Siddhi Constructions,
100sqft of 9" (brickwork).. bricks(standard)=no ? sand= cement=