How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
No Answer is Posted For this Question
Be the First to Post Answer
what is slope provided to floor?
1.(a.) how do you calculate the volume of mortar for 1 piece of block 450mm x 225mm x 225mm. (b.) calculate for 1sqm
What is the general specifications of a bituminous pavement road?
why no deduction for steel is made in the volume of concrete?
how calculate cutting length of stell in slab and column? give brif discussion with formula?
3 Answers ATS, Gammon, Pegasus,
what is period of de-shuttering for different area of slab of M25 grade?
What is the significance of cost estimate knowledge for an architect?
what is the specific gravity of cement .define it and value?
how to calculate concrete qty for footing using M25 grade 1:1:2 for 731 cft.
9 Answers Abuilding Lab, L&T, MPSC, Vellapally,
HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..total area need to be plaster is 985 sqm
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
m-25
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)