1) Explain why we don't link the two earthing system ht and mv on a pole mounted transformer sub-station.
No Answer is Posted For this Question
Be the First to Post Answer
how can we design robots
i have a 4 Mva transformer 34.5 kv / 480-277 v and i used 2 parallel 3200 amp bus duct for the secondary feeder using 3 ply of bus bar ( 3/8" x 5" ) as a common where the flexible link terminated and 6300 amps breaker for the main, the lower bus duct reaches 70 degrees and the upper bus duct reaches 55 degrees when i used thermal scanner. why the temperature is not balance when the load reaches 3600 amps.
What is George phenomena to start the synchronus machine?
In power transformer tappings are provided on A high voltage side B low voltage side C In middle of both the windings D both high and low voltage side
can any one explain about when EB supply failed then how the load will transfer onto DG's step by step.
WHAT INSTRUMENT IS USED TO MEASURE THE MAGNETIC FLUX?
How much depth we will take in 33kv sub station and why.
what may the reason for vector shift in a generator?
how do we know the LT or HT panel trip by some broblem which indication willshow
what will happen when choke in tube light circuit was not working???
what is the formula of starting current of 3phase and 1 phase motor???
which motor is suitable for traction? why?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)