Question 38 - The terminal velocity of a falling object, v is given by v = sqrt [ 4g (R - r) D / (3Cr) ] where sqrt is the square root of, g = 9.81, D = 0.000208, R = 1800, r = 994.6, m = 0.000893. The Reynold number, L is given by L = rD (v) / m. The C for various conditions are : C = 24 / L for L < 0.1; C = 24 (1 + 0.14 L^0.7) / L for 0.1 <= L <= 1000; C = 0.44 for 1000 < L <= 350000; C = 0.19 - 80000 / L for 350000 < L. Find the value of v for the situation above by trial and error, ^ is power, <= is less than or equal to.
Answer / kang chuen tat (malaysia - pen
Answer 38 - By trial and error, v = 0.016425. Excel function of program (Insert Function) in FORMULAS could be used to find a suitable value of C. Excel (Goal Seek : What-If-Analysis) in DATA could perform iteration on v. The answer is given by Kang Chuen Tat; PO Box 6263, Dandenong, Victoria VIC 3175, Australia; SMS +61405421706; chuentat@hotmail.com; http://kangchuentat.wordpress.com.
| Is This Answer Correct ? | 0 Yes | 0 No |
DEAR SIR, IS IT ANY BARC TECHNICAL OR INTERVIEW QUESTION BOOK IN CHEMICAL ENGG LAST YEARS IN MARKET? ALSO GIVE THE PATTERN HOW TO PREPARE AND WHAT TYPE OF QUESTION THEY ASKED?
UNIT OPERATION - EXAMPLE 9.3 : In the distillation of binary systems by Mc Cabe Thiele method, the equation for the line of top section is given by y = [ R / (R + 1) ] x + XD / (R + 1). 2 points on the line are (0.99, 0.99) and (0, 0.36). Find the reflux ratio of R and XD.
Why is respiration considered as an exothermic reaction? Explain?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.4 : A university is enrolling new students of biochemical engineering degree. A long queue is formed during registration. Let L = rate of newcomers to a queue, m = number of clients served at a certain time, T = time in system. In M / M / 1 queue, let T = time waiting in a queue + service time, L = 2 / second, m = 3 / second. (a) Find the service time, A = 1 / m. (b) Calculate time waiting in a queue, B = A (L / m) / (1 - L / m). (c) What is the value of T?
What are some common methods for helium leak testing a vacuum system?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.24 : (a) The net present value of an engineering project is given by V. Let Q = summation of [ T / (1 + I) ^ N ] from N = A to N = B, where P = project cost, T = tax inflow, N = duration. If V = P + Q where P = -$1000, T = $275, I = 0.12 (means 12 % , capital cost of project per year), A = 1 year, B = 5 years, calculate the value of V. (b) The present value tax shields are W = $ (11.9725, 9.1486, 6.5579, 4.1811, 2.0005) in 5 beginning balances of an engineering project. Find the adjusted present value of the engineering project X, when X = V + (summation of the values of W).
which is the major cement producing state in western India ?
Which part of oil creates smoke? ( aliphatic, aromatic, paraffin)
how to calculate material balnce & energy balnce
7 Answers MahaGenco, Oil India, ONGC,
ENGINEERING DRAWING - EXAMPLE 18.1 : For a Vernier scale of representative fraction (RF) = 1 / 25, calculate the length of the scale for the reading up to 4 metres.
in what way biot number is differ from nusselt number?
could anyone send me model question papers or outline of graduate trainee(chemical engg) post?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)