Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to find number of 16mm bar reqired for 5m length with 125 mm spacing ?

Answer Posted / lalit kumar

Number of bars = {(length in which the bar needed to be provided - 2(side cover))/ c to c spacing in b/w bars} + 1
No.of bars= {(5.0 - 2 X. 0.04)/0.125} + 1
No of bars= 40.36 or say 41 bars

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?

6687


how can we calculate steel value, depending on load

2235


Explain what is Critical Path Method (C.P.M)?

1110


suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?

2014


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2809


How to calculate woden area in sft and Cft

1520


how to find quantity of concrete in PCC M15

2093


how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation

1702


what post do you prefer to work in this company and why do you think you can serve better in such position?

2746


what does the track parameter mean in staad.pro?

6004


how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.

2571


why we are useing plastic under the lean concrete?and whts the advantage?

2679


what is work of planning deptt. in any construction compny (in road project)

2394


it is possiblee to produce concrete with out cracks...

1853


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

1206