Answer Posted / suresh bariya
Should be at least 10 days.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How much quantity of rod binding work by a rod binder per day
What is need for setting limits?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
Basic civil interview questionsÂ
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
1m square 20mm plastering how much of water need curing work
What is Critical path in Ms-Project ?
For Wet Mix Mecadam design what is Optimum moisture content
Who name us Engineer & Why?
What is Base Shear ?
Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....