How to measure the requirement of cement n sand for 12mm and 20mm plastering
thanks in advance
No Answer is Posted For this Question
Be the First to Post Answer
Consumption of Binding wire for fixing of cover block in vertical surface
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
how to create our resume?
0 Answers Sunraj Construction,
what is the formula of calculating number of bars?
What is the bending moment ?
1 Answers L&T, Manav Infra Projects,
Why concrete barriers have curved surface profiles?
for assembly supported beam main bar are provided at ?
How to calculate the volume of sloped isolated footing?
How to do base isolation using ETABS software?
What is the maximum distance between the stirrups?
minor loss due to sudden contraction 1>flow contraction 2>Expanssion of flow after sudden contraction 3>cavitation 4>boundry friction
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks