factory shed foundation
l=4,
b=3'
d=8' rcc foudation for top to bottom
pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
No Answer is Posted For this Question
Be the First to Post Answer
Draw the cross section of a boundary wall and label its part with detailing?
How to calculate measurement box size for M25 grade cement?
3 Answers Perunding Omega PMC,
what is mean by shear resistance in concrete?
3 Answers CCCL, Noble Consolidated Glazings, Sobha Developers,
Can we use 16mm dia bar in place of 12mm dia bar in COLUMNS? (if given dia bar is not available on site)
Concrete cover for slab, column, beam and footing?
How many number of bricks required for 1 cum & how much mortar quantity require for 1 cum
22 Answers Assurance, Campus Interview, R Tech Developers, Ramdev Construction, Synergy,
What is the proportion of M 45 grade of concrete
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
what is the difference between linear and curved elements?
what are the duties of Site Engineer in work site?
0 Answers Amarprakash Developers,
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
can we go for short rcc column without any steel rienfocement carrying truely axial load???