Hi..
I am a BE GRaduate in E&E. I have 8.5 Experience in
Tendering & Estimation field. I have done SAP SD course few
years back. But due to some reason i failed to get job in
that field and continued my own field. Now I am thinking of
changing into SAP seriously. How should i go ahead???
No Answer is Posted For this Question
Be the First to Post Answer
draw waveform of capacitor or inductor in a d.c ckt(during transient) with zero resistance with it(in series or parallel)also neglect resistance of wire
what factor is necessary during design of HT & LT MOTORS.
What is the difference between amorphous core transformer and CRGO core transformer?.
The magnitude of sum of two sinusoidal av voltage is equal to 230 volt.the magnitude of each individual voltage is also equal to 230 volt.what must be the phase difference between voltages?
0 Answers PGVCL Paschim Gujarat Vij Company Limited,
where is the need for short circuit test for 3 see is required and why? can you explain in brief with application
HOW COULD A SINGLE PHASE INDUCTION MOTOR ROTATE IN OPPOSITE DIRECTION???
In generally how many earthing required for power
how to calculate cable size by amp
What are the circuit models used for analysis of medium length transmission lines? Which one is superior? Support your answer.
what is the meaning of servo motor. In trains, what type of the motors we are using at the bottom of each compartment
difference between microprocesser and microcontroler
how many earthing should give for transformer body and nuetral