Hi..
I am a BE GRaduate in E&E. I have 8.5 Experience in
Tendering & Estimation field. I have done SAP SD course few
years back. But due to some reason i failed to get job in
that field and continued my own field. Now I am thinking of
changing into SAP seriously. How should i go ahead???
No Answer is Posted For this Question
Be the First to Post Answer
do you know measure the earth resistance?explain
what is load vs Torque curve & why it is used?
Explain the experiment on ward leonard method of speed control of a dc shunt motor.
which cable is preferred PVC OR XLPE for voltage from 220V to 11 KV with proper justification
MICOM P122 OC/EF RELAY HAVE HARMONIC RESTRAIN OR NOT?
How much maximum power can be transmitted on 66 KV transmission line?
1 Answers Konark, NDPL, Torrent Power,
as we know that N=120f/P speed of an im can be controled only through changing no if poles, can we control by changing the frequncy????
what is the meaning of Dd0yn11
my self i am raghu working as tech.. in my college the maximum demand is 211 kva presently we are using 12kva capacitors the target power factor is .95 so what capacity of capacitor banks should i install
What is earth fault?
What will happen if a dc source is given to a tubelight. Will it work or wont it work....
For DG or Transformer body earthing, is it necessary to terminate the earth bus to earth pit directly? If not terminated to earth pit directly in earth pit and connected to any common bus strip which ultimately connects to earth pit, what will be the pros and cons?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)