We normally make oil soak pits under Transformers. Oil from
soak pit goes to collection pit.
We provide granules/pebbles under transformers.
My question is weather granules/ pebbles to be filled in
soak pit or not? if yes upto what level?
No Answer is Posted For this Question
Be the First to Post Answer
why battery is connected in series?
PIU how does work?
how do you measure earth leakages in 3phase wires?
how to calculate cable size
HOW BETTER VOLTAGE REGULATION IS OBTAINED BY HIGH VOLTAGE TRANSMISSION....?
what solid earthing means?
1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)
Why the resistance grounding (NGR) is better than Solid grounding?
HOW TO CALCULATE GROUND FAULT CURRENT IN 430V 4000AMP AIR CIRCUIT BREAKER?
Diagram on interconnectivity of 11kv transformer with RMU (i.e, one incoming and two outgoing or two incoming and one outgoing)
Why Auto Transformer is called "Auto"? What is the logic?
if three phase supply is given to single phase transformer, what will happen?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)