what is the slump of pile concreting work? give me the value
of minimum and maximum value of slump and how give slump in
pile?
Answer Posted / englitu
The slump for pile, we use generally, is around 6 inches. The last part of your question, that is "how give slump in pile", is not clear to me.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
What is binding spacing of the rebars at lapping zones.
what is cross hair cursor?
How many litres of water used for curing of 1000sqft of slav
What is a projection line?
What is rolling stock
What is meant by scaffolding coefficient?
Define What is the tallest man made structure in the world?
How much quantity of cement,sand,stone used to build 1 cum of cc road??
what is the hanekom repairing material after concreting work
what is hydrostatic paradox?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What is the difference between Grade I, II and III of GSB?
explain what do you mean by the property development.
What is dead load impact load live load