Dear sir my name Ankit i m Diploma holder present working in
Welspun Corp ltd Anjar as Asst.engg (salary 14400/month ctc)
i Would like to change my company also i have selected in
ford India pvt ltd Sanand as trainee Tech with salary
12000/month so please suggest me for changing my job hope
for *ve response
No Answer is Posted For this Question
Be the First to Post Answer
why using earth testing rod 15 meter 30 meter long to each other?
how to ctrl motor by use of ac or dc drive.plz explain evdintly
hello! sir i did three year of diploma in electrical (2007- 2010) and now i m a student of electrical engineering. sir can i apply for germany visa for study and part tome work over there?
An 11kv system consisting of an underground cable to a sub station about 300 meters away was shut down for about 10 hrs. On energising, it tripped off on earth fault about 10---20 mins later 6 times but since than it is not tripping.its already 3 weeks now. The SPAJ was found to be fine. what could be the cause.No test had been done to determine the cause of the trippings till now because of demand.
what happends when an isolater is operated on on-load
can a 150 kva 3 phase 440v/230V delta-wye step down transformer can be use as step up transfoermer with connected loads at 440v side?
what are the analog quality input for protection function?what are minimum reqiments?
why the transformer primary and secondary windins vector groups vary? why it is something like Dy11 and not as Dy or Yy...
In three phase supply why we use R Y B Colour not other.
how can we solve the RMS value of alternative Qnty is .707 , explain detail .
how much test voltage should applied for tan delta test.
Is earthing done for AC or DC or both?