How much cement required for 1 cub.mt when ratio 1:3:6
for 1 cum of concrete mix of 1:3:6 ratio the amount of
cement can be calculated by the following way:
cement=1/(1+3+6)=0.1cum
| Is This Answer Correct ? | 3 Yes | 3 No |
How to calculate stabilizer for a machine
Green building has many positive effects on the environment. What are the most significant environmental benefits?
what is the rate of 4000sqft rate, with material tile plumbing all work with plinth? Pl. Send ans. Yourlifeme@indiatimes.com
how much steel is required for 40*35 ft roof slab41/2" thick.what is the spacing from bar to bar.
What methods and materials would you suggests for the Mediterranean environment?
tell about different type of wood available in india and there uses?
what is the difference between load bearing structure and framme structure?
what so you want to work?
What do we mean by domestic architecture artifacts?
RCC colums of 15"X9" each, roof height 20.5'ft, total pillars 36 nons. Span between pillar to pillar is 16/20/20 length wise and 16/14 width wise. Total Slab area 8000 sft and plinth area is 1900 sft. beams are 12"X9". kindly calculate load factor per sqft.
do we need to put gravel stone of size 2 inch before laying pcc
how many steel rod of the cilling 10'x10'