Is there any difference between interrupt and
acknowledgment?
No Answer is Posted For this Question
Be the First to Post Answer
what is the design architecture of cognos8?
Why do u want to join vastu vihar
I would like to build in Southern Ohio, iIn a forest, some sun, lots of shade and some damp conditions. What would be some options for building green in these conditions?
what is the difference between R/3 Number range and CRM range?
RCC colums of 15"X9" each, roof height 20.5'ft, total pillars 36 nons. Span between pillar to pillar is 16/20/20 length wise and 16/14 width wise. Total Slab area 8000 sft and plinth area is 1900 sft. beams are 12"X9". kindly calculate load factor per sqft.
how much steel is required for 1100 sqft of slab (area 25*43 ) & we need to consrtuct 3 floor
types of load
How is BP in CRM synchronised with R/3? What r all the steps involved?can we do the partner determination based on SALES AREAS?
what is the KVAR and how to measure it ?
Density of plasterboard 15 mm
how many steel rod of the cilling 10'x10'
i am looking for Final year Architecture Designer or any home based project worker in chennai. contact 9500092822