How much cement required for 1 cub.mt when ratio 1:3:6
Answer Posted / ahmad reshad
for 1 cum of concrete mix of 1:3:6 ratio the amount of
cement can be calculated by the following way:
cement=1/(1+3+6)=0.1cum
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
In informatica by using filter tranformation what is the filter condition to display for the single id empno
Who is responsible for territory? can you please help me in getting the answer for this
what is the difference between R/3 Internet sales and CRM Internet sales?can a plant be assigned to multiple company codes?can a sales org. be assigned?
what is the rate of 4000sqft rate, with material tile plumbing all work with plinth? Pl. Send ans. Yourlifeme@indiatimes.com
What is meant by fetch and execute cycle in cpu operations
Means of interrupt in cpu operations?
how to know low voltage and high voltage ranges for electrical machinery ?
Who can give me Stracher Design for my plan For Coloum Position. Please call me 9921761702
How is BP in CRM synchronised with R/3? What r all the steps involved?can we do the partner determination based on SALES AREAS?
what is the maximum depth at which the open foundation bridge can be done
how to measure 4mm,6mm,12mm,18mm plywood into a cubic meter and how many layers in a cubic meter
what is CEPT and ETSI for telecom?
what is the KVAR and how to measure it ?
I am architecture student. What type of foundation is preferred in Alluvial soil ? where the soil texture is sandy loam...and also which type of foundation is used for steel structure which will be for 6 story building design
Australian architecture should be much the same as American architecture because they both came from British influence and were founded at about the same time. I was hoping you could give me some insight on that and tell me if I should change my hypothesis.