a revised estimate is prepared when the original estimate
has exceed by more than
1 percent
2
10
18.40

Answer Posted / jatin

10%

Is This Answer Correct ?    11 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is civil all interview questions

2088


Why is concrete cube test carried out?

784


What is oneside mat. And explain 

2111


what is the criteria for the finalisation of pavement thickness in road project?

1599


how much repeitation for conventional and maivan formwork?

1599






how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

2149


What is the use of water table & Kreb stone for drain

1379


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

1515


what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

1755


Which type of plywood & sizes using in construction projects ?

664


What is the procedure of concealed plumbing in toilets?

1898


Material calculation of cm 1:6 for 1sqm

1516


what is the difference between tsp & tower

1727


How much material is required for constructing a 2 Lane 2Km rigid pavement road

1744


Slump Values for works?

1772