what is your role of in previous company as a construction manager
No Answer is Posted For this Question
Be the First to Post Answer
How to find the cuplock pipe qty in staging for Minor bridge?
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
What is difference between limit state and working stress method? How it is applies in building structure.
What is the diffence between prescribed mix and design mix
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Thumb rules for 1.brickwork & Blockwork 2.Plastering 3.FLooring and tiles 4.Shuttering 5.Steel
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Construction joint of beam & slab is provided at––
How to calculate the steel for 392c.meter*450c.meter rcc slab
Name the main components of a cad gui?
calculate the cost for AAC block wall of 15cum?
what is meant by shear center?????
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)