i have one air blow heater , coiled heater is in side hollow
ceramic tube and passing the air and other end hot air is
going out,
to control the hot air where i should fix up a THERMOCOUPLE
on the heater or on the out let of hot air terminal which
is the best way
No Answer is Posted For this Question
Be the First to Post Answer
Hoe electronic energy meter works?
What is Industrial Engineering?
7 Answers Bhushan Power Steel, Indian Designs Exports,
I m doing my B.tech in production engg.... can i apply for the company? In which subjects i will have to focus for the preparation?
Why we use pneumatic instrument.
what is preventive maintenance
What is different between preventive maintenance and maintenance?
What are the three managerial functions? Explain.
can you give me the solution of iiie
what is the current rating of both primary and secondary of 500kva,33kv./400v.distribution transformer?
mainly used for which boiler in BHEL?
What is DHCP & work?
What is quality management system? Weather qms is suitable, adequate and effective or not? Is there any quality policy? Is there any quality objective? If yes, then what are they? How they are planning to achieve quality objectives? Do they are measure quality objectives?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)