exact definition of defect tracking?
Answer / venkatesh balaraman
From the moment defect is opened, make sure that you are
updating the timely updates based on its severity.
Following up with respective teams(ex.Dev,requirements.etc)
is very important inorder to get the issue resolved.Once
the issue is fixed, it should be retested with proper data
provided and the defect should be closed with appropriate
comments.
| Is This Answer Correct ? | 6 Yes | 2 No |
plz tell me the V model with complete explanation(not definition)
What are the basic concepts of database that a software tester should know?
Difference b/w Test summary Report and Test closer report?whats content we include in both report.
What is your testing approach/plan if requirements are frequently changing?
what is the main difference between high and low level design in sdlc
11 Answers Accenture, Infosys,
What is the purpose of test strategy?
What is smoke testing and user interface testing ?
You have been given 2 projects to test, what are the key factors you consider when prioritizing you work load?
what is the output of the query select * from emp where 1=2
Difference between Test Plan & Test Strategy?
what is the diff between testing methodology and testing technique
what is smoke testing? what is sanity testing?