CROSS SLOPE OF Macadam Construction
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
how much binding wire is reqd for 1 MT
What is the proportion in M-20, M-25, M-30 grade of concrete?
What is a kip?
what is design mix of M10, M20, M35, M40 grade of conconcrete?
1 Answers ILD, Lok Sewa Aayog, Raheja, Vishwa Infrastructures,
in 1:4,1:6 and 1:8 cement mortar mix how much water required? and find water cement ratio?
how to know rcc strength
how much solid block in 1m3
WHAT TYPE OF MATERIALS (CHEMICALS) ADDED IN CONCRETE TO INCREASE THE STRENGTH OF CONCRETE?
how to shuttering is used in slab
how the sand fail?
From which end do you start deshuttering in a) cantilever portion b) simply supported portion
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)