Pleasd Tell Me.....
In Generating Stations Why The Generation Of ELECTRICITY Is In 3 Phase Form??
OR
In Generating Station Why We Generates The ELECTRICITY In The 3 Phase??
Why Not In The 4 Phase,
5 Phase Or 6 Phase Form??
Answers were Sorted based on User's Feedback
Answer / murali290
as phases increases the power handling capability
increases.so,compared to 1-ph&2-ph ,3-ph has more power
handling capacity.
but more than 3-ph has following problems even high
power handling capability
1:as no.of phases increases wounding of winding in
generator ,transformer becomes complex.
2:providing of heat sinks coplex
3:in transmission more length cross arms & heavy
supporters are required.
etc...........
by considering all above things we prefered 3-ph
system.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / hemanth
yes ,if more number of phases increases the power will be loss in the transmission line,because more number of phases creates more power.Due to this the power is transmitted from long distance so transmission line consists of RLGC ,due to this component in line power gets lossed .Not more but less.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / srk
Alternator will have star connected winding.In that star point(neutral wire) will be earthed.So power through 3phase only.......
Why not 6 pahse is it leads to I2R losses....
| Is This Answer Correct ? | 0 Yes | 5 No |
hi, in the event earth grounding is not available in a project, is there any other way to make the elcb work? fyi, i have an instant water heater (6.5kw) installed, however if there is grounding in the heating element inside the heater assembly, i will get grounded. thank you in advance to those who will answer my question.
at what basis/standard we have to arrive the current density of aluminium/ copper in busbar?
what is through fault?
For Bus duct hi pot test, where we want to connect the return and ground leads?
differtiate between energy consevation and energy efficiency..
What is the use of Surge Capacitor in LAVT?
We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?
I have 150/1A Rating CT Suppose if i inject 15A in CT " Secondary" means what will happen ??????
if we increase the frequency given to a transformer then wat will happen to the transformer size, whether it will increase?
howmany insolaters needed in 66kv line
At which time Synchronous generator act as a Synchronous Condenser?
what mean by analog ,digital,numerical meters and relays? say the example?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)