Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Diagonal check is required for a layout work to confirm ––

Answers were Sorted based on User's Feedback



Diagonal check is required for a layout work to confirm –– ..

Answer / k c kumar

To confirm the dimension of the member generally Columns.

Is This Answer Correct ?    3 Yes 0 No

Diagonal check is required for a layout work to confirm –– ..

Answer / sjtbehera

yes it is to conform the dimension of the respective
structure and distance.

Is This Answer Correct ?    1 Yes 0 No

Diagonal check is required for a layout work to confirm –– ..

Answer / kumar

Need for Cross Checking.

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

What is called dummy column, & what its uses ?

6 Answers   IGCAR,


What are the common ways of demolition?

0 Answers  


What is the difference between linear dimension and aligned dimension?

0 Answers  


How many mortar required for Brickwork of 1 Cu.m works??

0 Answers  


how many m3, mason should done per day if he going to build 4.5 inch brick work(partition wall)?

14 Answers   L&T,


Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?

0 Answers  


in 100 cft = 1350 bricks in 100 cft = ? bloks

0 Answers  


List out some of the common problems that architect have to tackle it?

0 Answers  


what are the types of design? which type of method is used at what type of design & why?

0 Answers   AVS,


Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.

19 Answers   DNA Infrastructure, HCC, L&T,


What is the amount of brick in cum we get in a BIG LORRY approx ??

3 Answers   Pegasus,


What is critical path method (c.p.m)?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)