Diagonal check is required for a layout work to confirm ––
Answers were Sorted based on User's Feedback
Answer / k c kumar
To confirm the dimension of the member generally Columns.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / sjtbehera
yes it is to conform the dimension of the respective
structure and distance.
| Is This Answer Correct ? | 1 Yes | 0 No |
What is Leastcount of 1. Total station 2. Theodolite 3. Dumpy level 4. Plane Table
what is the load bearing capacity of the scafolding pipe (50mm) and other.
What is the general specifications of a bituminous pavement road?
where vr providing singly reinforced beam. i want to know the location of it in a building
why elongation index is not required for concreteing coarse aggregate..
10mm aggregate 1brass = How many KG
1 Answers JMP, Rathore Group, Trishul Construction,
How foundation is designed, Column design and beam design
0 Answers College School Exams Tests, L&T,
what radial pressure, the NP2 class rcc pipe can sustain?
Two way slab, curtailment provided in both side in longside and short side. which side curtailment provided in one way slab?
What is the procedure of concealed plumbing in toilets?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)