If it requires 8 men to build a wall in 10 days then what
time will it take to build by 4 men?
Answers were Sorted based on User's Feedback
Answer / venkat
it requires 20 days to complete the same wall.
8 people - 10 days
4 people - 20 days
| Is This Answer Correct ? | 3 Yes | 1 No |
while installing jad file to mobile its giving processing attribute MDlet-jar-URL error...how to fix it
If memory is allocated to a class,when object of the class is created then how do we use the abstract class methods.coz v cant create obj of abstract class, only reference is created,when the abstract class data and members got the space in memory??
/bin/bash is missing.
what is means of admistrative distance
my first question in huawei was ....1)Tell me about your self 2) oops concept 3)logic gates 4)ram and rom ,what is cache memory nd where it is located 5)diffrence between file system and data base 6) procedure of operating system 7)what is c# 8)high level language and machine language 9) and from mobile networkin !!!! hope thz will help you
hiii.. i wanna ask u is it neccessary to take coaching for preparing for interwiews for placement. because we have toclear the aptitude test
what is the diffeence between SQL and ORACLE?
What a test plan contains
SQL How can make delete and insert in one query
5S training documents
what is the quantity of cement and sand in 1 sq.m (mortar ratio ) a, 1:4 b, 1:3 c, 1:6
what is dedicated earthing??????
3 Answers APC, ElectroMech, Emerson, JLL, JP Group, Tata Liebert,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)