If it requires 8 men to build a wall in 10 days then what
time will it take to build by 4 men?
Answer Posted / venkat
it requires 20 days to complete the same wall.
8 people - 10 days
4 people - 20 days
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
Explain force?
what are the various login options used in loadrunner tool to make a application performance testing
where is the first vidhyalaya of physically handicaped
please answer the following question: A table contains the monthly sales data for the 12 months of a year and for the 4 sales zones where each zone has 8 districts.The table is defined in WORKING-STORAGE SECTION.What is the size of the defined table in number of bytes? write statements to calculate the total sales for each month.
Derive the equation that links voltage, charge and capacitance.
sir,i am a 3rd yr student of computer engineering. i need atleast 10 previous year's placement papers of hcl,infosys & wipro. please send me these papers as early as possible.thanx for giving me your precious time.
how the class is instance of object?
sir, please send me the last three years exam papers conducted by CPCL- RECRUITMENT EXAM FOR Recruitment of Engineer ELECTRICAL ENGINEERING. A Soon as possible. i would be greatfull to u
what is the differance between a technology and an engineering ?
what is advantages and disadvantages of vlan?
I have completed my B.E with (CSE) computer science and engineering ,i had a total no of backlogs=20 ,is there any chances to get the visa PLEASE HELP ME NE1 : MY ID=john_searchig143@yahoo.com .
Write the fetch cycle and execute cycle for following instructions:JMPNZ (jump to the given address if the accumulator not equal to zero) RET(return from a subroutine) ADB (add the contents of register B to the accumulator and save result in the accumulator).
HELLO ALL OF U.I HAVE QUALIFIED IN SBI CLERICAL WRITTEN EXAMINATION AND MY INTERVIEW IS ON 20TH OF THIS MONTH.IAM SOTWARE BACKGROUNDED CANIDIATE SO CAN ANY ANYBODY WHOSE INTERVIEW IS OVER CAN TELL ME THAT WHAT QUESTIONS THEY ASKED RELATING TO COMPUTER SCIENCE.
1.orders for a computer are summarized by the additional features and are requested as follows; Proportion of order No features 0.3 One feature only 0.5 More than one feature 0.2 find; 1. what is the probability that an order requests at least one feature? 2. what is the probability that an order does not request more than one feature?
Why is it that a single, all – encompassing metric cannot be developed for programme complexity or programme quality?