how to calculate quantity of steel in a slab , coloumn and
beam
Answer Posted / islam alam
According to thump role. Slab 0.75-2%. Beam 1. 5- 2%. Column 1. 5- 4%
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
how to identify np3 pipe and np4 pipe
How many cum of 9.5mm stone in 1 ton ?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
The 4 main factors to start a construction project are––
IS code for grade of concrete for bamboo lintel????
what are the changes in concrete pour height as per IS 456, 2009?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
How much cement will require for 1Rmt Skirting laying
whats is difference between anchorage length and development length
What is geopolymer based concrete?