what is chiller system?
centralised AC system of multistoreyed buildings run by 200 / 300 / 400 Tonne capacity chiller.
| Is This Answer Correct ? | 0 Yes | 0 No |
Dear Sir, I got 90kilowat and 3 face for my house.So which cable is the best for my home main line. Thanks Bashir Ahmed e-mail: bcon.ba.bd@gmail.com
Hi i am going to attend Deputy Architect interview in Telecommunication Dept. through UPSC I dont know the type of questions they will ask. I will be very thankful if anyone could help me. Please send to my email-id ganesh_dev@rediffmail.com Please any one have experience of some other Dept., please reply me. my interview in on 10th of Nov. only 5 days left. please help.
Is there any information about building environmentally in the retarded South. (SC)?
what is advantages and disadv.of e-banking.
I would like to build in Southern Ohio, iIn a forest, some sun, lots of shade and some damp conditions. What would be some options for building green in these conditions?
What will be current cost Rs. per Sq.Ft. of RCC slab for home construction in sangli (maharashtra state)?
what caused you to decide become an architect?what skills do you bring to this job?
I am architecture student. What type of foundation is preferred in Alluvial soil ? where the soil texture is sandy loam...and also which type of foundation is used for steel structure which will be for 6 story building design
Which of the following sentence is not correct
Green building has many positive effects on the environment. What are the most significant environmental benefits?
what is the difference between R/3 Internet sales and CRM Internet sales?can a plant be assigned to multiple company codes?can a sales org. be assigned?
how to measure 4mm,6mm,12mm,18mm plywood into a cubic meter and how many layers in a cubic meter
0 Answers HCL, ITI, MSCB, Vishal, Wood Paker,