what is the standard bricks size,
and which tools required for mason work
3. Assume a building having three floor and a lift, the lift has the following buttons: a. G (for ground floor) b. 1 (for first floor) c. 2 (for the second floor) d. 3 (for the 3rd floor) e. Stop (Stop button to stop the lift in emergency) Assume currently the lift is in the ground floor; write an algorithm for the lift to work.
What details do you notice about the way this building is constructed? How does it differ from your own home?
how do we calculate lux for museum building? what is the procedure?
what is Romanesque Architecture?
what is the KVAR and how to measure it ?
types of load
What is meant by fetch and execute cycle in cpu operations
why we use stub column
what is hvac?
tell about different type of wood available in india and there uses?
Who can give me Stracher Design for my plan For Coloum Position. Please call me 9921761702
what so you want to work?