The ration of the volume of a cube and of a solid sphere is
363 : 49. The ratio of an edge of the cube and the radius
of the sphere is (Pie =22/7)
Answers were Sorted based on User's Feedback
A telephone cable is to be run from a junction point on the bank of a river 900 meters wide to an office that is located 3000 meters downstream on the opposite bank. If the cost of laying cable under water is Rs. 5 per meter and that of laying overhead on land is Rs. 4 per meter, find the point downstream where the cable is to cut across the river. (a) 450 (b) 1800 (c) 2800 (d) 2100 (e) 2700
i need rs aggarwal verbal &nonverbal book download link plzzzzzzzzzzzzzz i nned by 2marow morning
55 Answers Accenture, Arihant, CTS, eInfochips, HCL, IBM, Infosys, MNB, Ram Infotech, SSB, SSC, TCS, Tech Mahindra, Thought Works, Wipro,
can anyone plz send me bank clerical posts model papers pushyamis@yahoo.com
A company rented a machine for Rs.700/- a month. Five years later the treasurer calculated that if the company had purchased the machine and paid Rs.100/- monthly maintenance charge, the company would have saved Rs.2000/-. What was the purchase price of the machine?
If an object travels at five feet per second, how many feet does it travel in one hour?
If a ball falls from 16 feet takes 4 seconds. How much time it will take when falls fron 64 feets.
A room is 30 X 12 X 12. a spider is ont the middle of the samller wall, 1 feet from the top, and a fly is ont he middle of the opposite wall 1 feet from the bottom. what is the min distance reqd for the spider to crawl to the fly.
Each side of a rectangle is increased by 100% . How much the percentage of area will be increased
11 Answers Accenture, CMC, Zycus Infotech,
If x + 8y = 20 and x = -3y, then y =
A mall installed 36 cctvs at the beginning of the year. In March they installed 9 additional cctvs and then disconnected 18 in August. How many were still installed at the end of the year.
There is a work which can be completed by A with 12 days and B by 18 days. A and B works together for 3 days and B left. After that how many days for A to complete the work?
The average salary of Ram, Shyam and Sundar is 95 Rs. per week. If Ram earns Rs.115 and Shyam earns Rs.65.What is the salary of Sundar.