How much quantity of coping is done per day by one mason in
Rmtr?
Answer Posted / n.v.ramana
30rmt depending upon the height and site condition.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what motivates you to do a good job
HOw much % of premium on DSR-2013 currently
what is raft foundation
Define angular dimension?
rimmer in pile foundation
What is semirigid connections?
trapozidal
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Explain what is 1/8 on the architect ruler denotes?
What is the outturn of Ceiling plastering
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?