Answer / vijaya sagar reddy g
Normally Test engineers are responsible for any release of
a project.Even the release is for staging environment or
change request release or production release
The minimum documents are
1.Test Plan
2.Test Cases
3.Test Case Report
4.Bug report.
5.Release notes(which contains known issues).
6.installation document.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / rajesh.pothina
hi,
the document neaded to prepare testing are
1. srs document
2. fs
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / rajasundar
Though the work of QE starts from Estimation..
The documents are :
1.While understanding the scope of the project if you are
getting the answers for your queries from Dev team then
consolidate it in an xls file.
2. Test Plan
3. Test Cases document
4. Trackers for each build (Tracking the result of your
testcases and bugs).
5. Status report document(Can be weekly; depends)
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / nag
1. BRS
2. SRS
3. HLD
4. LLD
5. TEST STRATEGY
6. TEST PLAN
7. TEST CASES
8. DEFECTS REPORTING
9. FINALLY SUMMARY REPORT
Nag
9989093551
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / rumana farheen
When all the requirements and the entire fuctionality of
the application is completely tested with the help of SRS
and BRS the documents required to prepare during testing are
Test Initiation
Test Planning
Test Design
Test Execution
Test Log Report
Defect Tracking
Testing Report
Thank you
| Is This Answer Correct ? | 0 Yes | 2 No |
How will you teach internet to 90 year old women (Grandamma)..i want see the response of this question.This was one my inerview question.
Is Regression Testing done for Manual Testing projects?
Functional testing is the part of System testing or System testing is the part of functional testing
What are Levels of Functional testing?
can som1 can tell me that can two or more tester can be given the same project for testing such as unit, regression,UIT,retesting. suppose the project has 10 modules so can all the tester will be asine to write the test cases for same or for differt modules? and in one project how many testers of the same level can participate? plz answer it fast. txs in advance and in which phase we will do the retesting in stlc
What is the difference between volume and stress?
which is the most important test case on the login page ?
Explain Water fall Model
What is the difference between use case and test case? give example.
how can we connect database in manual testing? pls answer for this
What Questions Project Manager will be aske?
What is testing process