Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What are the document required to prepare during testing?

Answers were Sorted based on User's Feedback



What are the document required to prepare during testing?..

Answer / vijaya sagar reddy g

Normally Test engineers are responsible for any release of
a project.Even the release is for staging environment or
change request release or production release

The minimum documents are
1.Test Plan
2.Test Cases
3.Test Case Report
4.Bug report.
5.Release notes(which contains known issues).
6.installation document.

Is This Answer Correct ?    5 Yes 0 No

What are the document required to prepare during testing?..

Answer / rajesh.pothina

hi,
the document neaded to prepare testing are
1. srs document
2. fs

Is This Answer Correct ?    3 Yes 1 No

What are the document required to prepare during testing?..

Answer / rajasundar

Though the work of QE starts from Estimation..
The documents are :
1.While understanding the scope of the project if you are
getting the answers for your queries from Dev team then
consolidate it in an xls file.
2. Test Plan
3. Test Cases document
4. Trackers for each build (Tracking the result of your
testcases and bugs).
5. Status report document(Can be weekly; depends)

Is This Answer Correct ?    1 Yes 0 No

What are the document required to prepare during testing?..

Answer / nag

1. BRS
2. SRS
3. HLD
4. LLD
5. TEST STRATEGY
6. TEST PLAN
7. TEST CASES
8. DEFECTS REPORTING
9. FINALLY SUMMARY REPORT

Nag
9989093551

Is This Answer Correct ?    2 Yes 2 No

What are the document required to prepare during testing?..

Answer / rumana farheen

When all the requirements and the entire fuctionality of
the application is completely tested with the help of SRS
and BRS the documents required to prepare during testing are

Test Initiation
Test Planning
Test Design
Test Execution
Test Log Report
Defect Tracking
Testing Report


Thank you

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Manual Testing Interview Questions

What is show stopper defect and explain with example ?

5 Answers   Unisys,


in configuration tool as a tester wich documents u r going to add

2 Answers  


when do u stop testing?

7 Answers  


could any body plz let me know which is best training institute for telecome testing in hyderabad?

0 Answers  


what techinques do u follow in suring testing?

1 Answers   ANZ,


Can we use automation tools during static testing? If yes when and how?

3 Answers  


Q-1 WHAT IS USE CASE? Q-2 Test cases cannot be developed with system users and designers as the use cases are being developed? true or false Q-3 WHAT ARE DIFFERENT TYPES OF INCREMENTAL TESTING? Q-4)The cost of fixing a fault a)not important b)increses the later fault is found c)decreses the later fault is found d)can never be determined

3 Answers  


As a testing engineer what to do if same defect is occured again in the software??

2 Answers  


what is function testing?

8 Answers   nvidia,


How can u do the performance testing?

2 Answers   Wipro,


hi guys presently m working as a Technical Associate in a support team in mumbai.Jst now i hav completed my testing course of 2 months.I am B.Tech pass out of 2006.I want to swich my job in testing field. So pleae help me out & do something 4 me.

0 Answers  


When to stop testing? (Or) how do you decide when you have tested enough?

0 Answers  


Categories