what is the difference between compaction and consolidation?

Answers were Sorted based on User's Feedback



what is the difference between compaction and consolidation?..

Answer / tsegahailu1336

removal of air from voids is compaction..and removal of
water is consolidation

Is This Answer Correct ?    18 Yes 3 No

what is the difference between compaction and consolidation?..

Answer / ved prakash singh

compaction is a process in which we remove the air voids
with the help of mechenical or manual means and
consoidation is a natural process in which intraped water
in soil voids remove with passes of time.

Is This Answer Correct ?    12 Yes 0 No

what is the difference between compaction and consolidation?..

Answer / avijit roy chowdhury

Compaction is a mechanical process to remove voides & it
required less time Where As Consolidation is a natural
process to remove voides & it required large time.

Is This Answer Correct ?    8 Yes 2 No

what is the difference between compaction and consolidation?..

Answer / niranjan

drier soils are compacted,,,, wetted soils are consolidated

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

0 Answers  


what is mean by stripping?

2 Answers  


Geometric Design Related Code name in India.

1 Answers   L&T,


How much wastage we considered for cement

6 Answers   Jain Housing, L&T,


what is the weight of sand,corrse aggregate and steel,for 1cum

1 Answers   Gulf Asia, Jade Software, Sand,






Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

0 Answers   Rites,


What is Base Shear ?

0 Answers  


I am planning to construction in my plot in Pune (Chandan Nagar) and its near about 1950 SqFt. Can some plz help me on the rate on per sqft for RCC,Brickwork & Plaster,Flooring,Water proofing,Door. Thank you in advance

1 Answers  


mix design ratio of M30 concrete

1 Answers   KITL,


(Project Management Topic) What are the important criteria in the successful realization of the project?

0 Answers  


When brick size is 3x5x9" , what would be the number of Brick requirement for 100 sqft area of 5" width?

5 Answers  


What is Pavement & carrage way?

7 Answers   NBCC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)