Is there any decided or standard frequency to check the
meager testing of transformer, DG set, LT Panel in the
industries in a year.
I means how many times we should be check the same.
Answers were Sorted based on User's Feedback
Yes as per NBC It's in summer and twice in a year.
Is This Answer Correct ? | 0 Yes | 0 No |
Which of the following statements is incorrect?(a) 1N = 1 kgm/s2(b) 1V = 1 J/C(c) 30mA = 0.03A(d) 1 J = 1N/m
tate and explain super position theorem
please send previous exams question papers
how to calculate the current if i know power in MW and voltage 11kv/415v and also want to know that incoming cables for trnsformer
6 Answers Daikin, KOC, Reliance,
how to set relay setting? and example calculation...
High voltage test procedure of in swgr board. why should measure millivolt drop on testing time?
What is reactance, reluctance,capistance, pls give answeer in hinglish and be simply Jo asani we smajh m aa jaye
We order Dyn 5 distribution transformer to a company. What arrives is Dyn 11. Is it ok to use this transformer. It will be installed alone.
1)why the transformer rating in KVA insted of KW 2)why the secondary of ct is shorted and why the PT secondary is open
please send me previose rrb junior engineer qustion papers
How much maximum power can be transmitted on 66 KV transmission line?
1 Answers Konark, NDPL, Torrent Power,
what is the preventing maintenance of transformer