What is the importance of counter based plan & how is it
scheduled?
No Answer is Posted For this Question
Be the First to Post Answer
Sir if i have 2kv ups in which 17ah 8 battries load 600watts how much back up time i get and if i put 6kv ups with the same no of battries same amp can i get more back up time please give reply exactly what is the procedure to calculate back up time for different kv,s
why we setting 95 deg and 105 deg in wti and oti of distibution transformer ? give the reson for that ?
please tell 1 ton equal to how many kilo watt?? in some converter software's that is 3.5 kw. is it right?
While connecting bulb in Series/Parallel,there is any difference in glowing
what happens if DC earthing and AC earthings are shorted?
In brushless excitation system how generator field current is measure even if the slip rings are absent?
What is a surge supressor why its is used in synchronous generators
DIFFERENCE BETWEEN GROUND AND NEUTRAL?
Hi My dear all Friends, There is a question regarding HVAC Engineering and widely used in Power Projects. Question- What is the diffrence Between REF, SEF and Differential Protection....???? Where REF - Restricted Earth Fault SEF - Senstive Earth Fault.
Can u tell me about HVDC transmission?
If u have 60KVA UPS, than tell me how systems ( computers ) u may connect?
what is range ACB
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)