Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why I think QA is the positon for me

Answers were Sorted based on User's Feedback



Why I think QA is the positon for me ..

Answer / sai

QA is very challanging job because as a QA tester without any technical knowledge we can test the functionality of the sw and find the issues in developed sw. I always act like a end user while using the application. If end user is satisfied with developed sw NO DOUBT developed sw is picture perfect and bug free sw. I always wants to explore something and find new things thats why QA position is better choice for me.

Is This Answer Correct ?    6 Yes 0 No

Why I think QA is the positon for me ..

Answer / rashmi

In QA the chances of risk or understress is very less n we can do the efficiently with our technical skills to improve the quality of the software and achieve a high position within a min time............

Is This Answer Correct ?    3 Yes 4 No

Why I think QA is the positon for me ..

Answer / s.k

qa is a plan and systimatic aproch that inpruve the
performance of software

Is This Answer Correct ?    1 Yes 3 No

Post New Answer

More Test Documents Reporting Interview Questions

if there are 10 step in test cases while executing if their is mismatch at step 5 what is status of test case ? pass or fail or pending or test not complete or else? if require tab is not available then what's the status of test case?

9 Answers  


what type of documents needed in every phase of sdlc for SQA?

2 Answers   UHG,


If there is any error in RTM. What you will do? Please reply it.

6 Answers   Infosys,


If you are working closely with business team, after receiving the requirements, if you think requirements need some changes, When will notice they need to be modified?,when will you approach them.exactly in what phase of SDLC?

4 Answers  


After asking the defect life cycle, if you think it is not a valid defect, what you will do, whether you will store in any document for future reviews,if yes, what is that document, where you will save that document? or just reject it and close it?

4 Answers  


can any one help me? What is the Trecebility matrix ? what is that use and when it use and where it use

6 Answers  


how will you know whether your reported defect rejected?

4 Answers  


An engineering college wants to automate their examination activities to speed up their work and maintain high-end accuracy of information. A brief overview of the proposed system is given below: The proposed examination system is consisting of 8 semesters spread across 9 branches (assume your own branch names) and spans over a period of 4 years. Each student belongs to a branch and must register for a minimum of 6 courses but not exceed 8 courses maximum. The scoring pattern for each course is given as below: Maximum marks for each course: 100 Pass: 35% Distinction: 70% and above First class: =>60% and <70% Second class: >50% and <60% Pass Class: >=35% and <50% The proposed system computes the result and announces the results every semester. The results must be accurate and all examination records will be maintained till the students leave the college. Develop a Test Strategy to test the proposed system. Your Test Strategy must include the following: • Test Plan • Testing Methodology to be followed • Test cases • Test effort estimation • Test Correction Mechanism Note: If you need more information on the requirement specification, you are permitted to assume along the same line but clearly specify the details.

1 Answers   JWC,


what type of testing process is going on your company?

8 Answers   Accenture, CTS, ISPG, Ordain Solutions,


What is the Reporting Tool in java explain and give example?

1 Answers   Wipro,


I need to prepare a Test Plan. Any one can provide the a Test Plan model which is sinple so that I can change use it in my company...

2 Answers   Global Edge,


Test Documents Reporting answers

4 Answers   ABC, Mastek,


Categories