Isometric drawings are generated during _________________
phase of a project
No Answer is Posted For this Question
Be the First to Post Answer
What is surge and how is it prevented, what is the purpose of bypass valve across AS valve.
Why 4-20mA SIGNAL IS PREFERRED OVEA A 0-10v signal?
WHAT IS THE MAIN WORKING OF BOILER.
How to Calibrate Flow Switch in field
why Fahrenheit unit of moistur analyzer transmitter
what is your eligibility criteria for freashers?
Why 4mA-20mA current loop selected as standard ???
where uses EXe /EXd/Exo/Exn/Exp/Exq/EXia
what is zero trim and span trim?. at which problem we need to use this?
can any one tell leakage class in control valve depend on which parameter and there is any specific table or chart for selection of valve leakage class
If mVolts can drop by resistance of wire as compare to mA, then how thermocouple mV reaches in CCR as accurate value?
what is pyrometer? which purpose it has to be used?