How to calculate the crank length of the rod in beam? Please
give me a details.

Answers were Sorted based on User's Feedback



How to calculate the crank length of the rod in beam? Please give me a details...

Answer / dhananjay

Crank length= 1.42*d(Here d is dia of the end hook of the rod)

Is This Answer Correct ?    30 Yes 3 No

How to calculate the crank length of the rod in beam? Please give me a details...

Answer / ram

the crank length of rod may
be provided full length of
beam.but in practical due to
some critical the crank length
from top 0.67*depth of beam
and from bottom crank
0.335*depth of beam..
Example the beam dim is
230*456mm the crank length
is 300mm for top and 150mm.

Is This Answer Correct ?    4 Yes 1 No

How to calculate the crank length of the rod in beam? Please give me a details...

Answer / partha mitra

Crank length= 1.42*d(Here d is dia of the end hook of the
rod)for one bend @ 45 deg bend.

Is This Answer Correct ?    3 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

how to know rcc strength

2 Answers   L&T,


Are you comfortable with formal design concepts in the home furnishings area?

1 Answers   ENI, L&T, SPML,


Meaning of m20 and m200 concrete

10 Answers   WBPSC West Bengal Public Service Commission,


where we provide hinged joint in a framee structure ?

3 Answers  


What are the applications of cad?

0 Answers  






Cement coefficient used for Solid and hollow concrete blocks

1 Answers   DCB,


the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum

0 Answers  


how much minimum steel provide in column

4 Answers  


how can calculate qty of steel required for one or two ways slabs..

1 Answers   Proscape LLC,


what is tmc ,term is used in measureing water, pls tell me 1 tmc = how many litres?

18 Answers   College School Exams Tests, Irrigation, IT Consulting Services, IVRCL,


Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.

1 Answers   AK Construction,


what is the salry which I am expect in kolkata for diploma in civil engineer with 3 years 6 month exp.???

6 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)