Answer / jile singh
piu(power interface unit) convert 3 phase ac power supply in
230 volt ac with stablised and no surge and interference
effect. piu mostly used in telecom sector for providing ac
supply to all equipment used in shelter and also control dg
and consist a lot of protection and showing alarm indication
and record events upto 500.
Is This Answer Correct ? | 224 Yes | 17 No |
Answer / saurabh
Piu used in telecom sector for providing ac
supply to all equipment
Is This Answer Correct ? | 87 Yes | 11 No |
Answer / ajay
PIU or PMU is multi functional equipment.
1.main purpose of to provide auto controlled output voltage
2.it have in build auto-mains failure system
3. it is controller of DG to run dg in auto mode
Is This Answer Correct ? | 42 Yes | 3 No |
Answer / kuldeep singh
PIU means automaton part of Active parts . PIU same equipment SPS & IIPMS but IIPMS meaning PIU + SMPS .
PIU different parts CPU cards , Contter etc part .
Is This Answer Correct ? | 10 Yes | 2 No |
Answer / wittingsun78
PIU and UPS are the same thing? in telecomunication
Is This Answer Correct ? | 14 Yes | 33 No |
Can anybody inform me about the pattern of ECIL GET( Graduate Engineers Trainee) interview for Electrical students? Will there be HR round as well? I thought of preparing for 2 to 3 subjects thoroughly. Will it be sufficient? Please share your thoughts.
what perpose of use CT ratio in gt,st,uat
What is system earthing?what are the types?
Why it need to form a capcitor when it not been in use from three or two year. Plz describe it technically.
WHAT IS THE REASON FOR THE GROUND PIN IS BIGGER IN SIZE COMPARING TO OTHER PINS?
dear friends, how to calculate "Gage" in copper wire , aluminum wire etc. have any formula?
What is the disadventage of gland earthing(power cable) if any. ?
during the period of armature reaction ,if the brush shift is not accomplish, what happen?
I have two AC generators, the first rated 2680KVA for 380V/4345A/pf:0.7 and the second rated 3461KVA for 5500V/363A/pf:0.8. I want to parallel the two generator to a bus. The second generator passes through a transformer to down the voltage to 380V and a part of its power goes to another bus so that it's only a part of the total power of the second generator taht goes to the considered bus. I have two Basler DECS100 AVR regulator. How can I make the synchronization ? What others equipments must have ?
what is p.s impedance measurement test in earthing transformer?
Following test should be conducted to find out relative polarity of transformenr terminals A no load test B back to back test C phasing out test D none of above
What is use of 3phase instead of single phase?
12 Answers DCM, L&T,