The window of time recovery of information processing
capabilities is based on the:

A. criticality of the processes affected.

B. quality of the data to be processed.

C. nature of the disaster.

D. applications that are mainframe based.



The window of time recovery of information processing capabilities is based on the: A. criticali..

Answer / guest

Answer: A

The criticality of the processes that are affected by the
disaster is the basis for computing the window of time
recovery. The quality of the data to be processed and the
nature of the disaster are not the basis for determining the
window of time. Being a mainframe application does not of
itself provide a window of time basis.

Is This Answer Correct ?    9 Yes 1 No

Post New Answer

More CISA Certification Interview Questions

The interface that allows access to lower or higher level network services is called: A. firmware. B. middleware. C. X.25 interface. D. utilities.

1 Answers  


Which of the following findings would an IS auditor be MOST concerned about when performing an audit of backup and recovery and the offsite storage vault? A. There are three individuals with a key to enter the area. B. Paper documents also are stored in the offsite vault. C. Data files, which are stored in the vault, are synchronized. D. The offsite vault is located in a separate facility.

1 Answers   Apple,


A company has contracted with an external consulting firm to implement a commercial financial system to replace its existing in-house developed system. In reviewing the proposed development approach, which of the following would be of GREATEST concern? A. Acceptance testing is to be managed by users. B. A quality plan is not part of the contracted deliverables. C. Not all business functions will be available on initial implementation. D. Prototyping is being used to confirm that the system meets business requirements.

3 Answers  


The BEST method of proving the accuracy of a system tax calculation is by: A. detailed visual review and analysis of the source code of the calculation programs. B. recreating program logic using generalized audit software to calculate monthly totals. C. preparing simulated transactions for processing and comparing the results to predetermined results. D. automatic flowcharting and analysis of the source code of the calculation programs.

1 Answers  


Use of asymmetric encryption in an Internet e-commerce site, where there is one private key for the hosting server and the public key is widely distributed to the customers, is MOST likely to provide comfort to the: A. customer over the authenticity of the hosting organization. B. hosting organization over the authenticity of the customer. C. customer over the confidentiality of messages from the hosting organization. D. hosting organization over the confidentiality of messages passed to the customer.

1 Answers  






Which of the following controls would be the MOST comprehensive in a remote access network with multiple and diverse subsystems? A. Proxy server B. Firewall installation C. Network administrator D. Password implementation and administration

1 Answers  


When a PC that has been used for the storage of confidential data is sold on the open market the: A. hard disk should be demagnetized. B. hard disk should be mid-level formatted.s C. data on the hard disk should be deleted. D. data on the hard disk should be defragmented.

1 Answers  


Which of the following devices extends the network and has the capacity to store frames and act as a storage and forward device? A. Router B. Bridge C. Repeater D. Gateway

1 Answers  


The risk that an IS auditor uses an inadequate test procedure and concludes that material errors do not exist when, in fact, they do, is an example of: A. inherent risk. B.control risk. C. detection risk. D. audit risk.

1 Answers  


When reviewing a business process reengineering (BPR) project, which of the following is the MOST important for an IS auditor to evaluate? A. The impact of removed controls. B. The cost of new controls. C. The BPR project plans. D. The continuous improvement and monitoring plans.

1 Answers  


Change management procedures are established by IS management to: A. control the movement of applications from the test environment to the production environment. B. control the interruption of business operations from lack of attention to unresolved problems. C. ensure the uninterrupted operation of the business in the event of a disaster. D. verify that system changes are properly documented.

1 Answers  


When auditing the requirements phase of a system development project, an IS auditor would: A. assess the adequacy of audit trails. B. identify and determine the criticality of the need. C. verify cost justifications and anticipated benefits. D. ensure that control specifications have been defined.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)