Which of the following types of controls is designed to
provide the ability to verify data and record values through
the stages of application processing?
A. Range checks
B. Run-to-run totals
C. Limit checks on calculated amounts
D. Exception reports
Answers were Sorted based on User's Feedback
Answer / guest
Answer: B
Run-to-run totals provide the ability to verify data values
through the stages of application processing. Run-to-run
total verification ensures that data read into the computer
was accepted and then applied to the updating process.
| Is This Answer Correct ? | 22 Yes | 1 No |
Which of the following would an IS auditor consider to be the MOST important to review when conducting a business continuity audit? A. A hot site is contracted for and available as needed. B. A business continuity manual is available and current. C. Insurance coverage is adequate and premiums are current. D. Media backups are performed on a timely basis and stored offsite.
To review access to ceratin data base to determine whether the "new user" forms were correctly authorized. This is an example of:
The most common reason for the failure of information systems to meet the needs of users is that: A. user needs are constantly changing. B. the growth of user requirements was forecast inaccurately. C. the hardware system limits the number of concurrent users. D. user participation in defining the system's requirements was inadequate.
Which of the following represents the GREATEST potential risk in an EDI environment? A. Transaction authorization B. Loss or duplication of EDI transmissions C. Transmission delay D. Deletion or manipulation of transactions prior to or after establishment of application controls
Which of the following is the MOST important objective of data protection? A. Identifying persons who need access to information B. Ensuring the integrity of information C. Denying or authorizing access to the IS system D. Monitoring logical accesses
An IS auditor should be concerned when a telecommunication analyst: A. monitors systems performance and tracks problems resulting from program changes. B. reviews network load requirements in terms of current and future transaction volumes. C. assesses the impact of the network load on terminal response times and network data transfer rates. D. recommends network balancing procedures and improvements.
Which of the following is a role of an IS steering committee? A. Initiate computer applications. B. Ensure efficient use of data processing resources. C. Prepare and monitor system implementation plans. D. Review the performance of the systems department.
Which of the following is the MOST important function to be performed by IT management within an outsourced environment? A. Ensuring that invoices are paid to the provider B. Participating in systems design with the provider C. Renegotiating the provider's fees D. Monitoring the outsourcing provider's performance
Which of the following is the MOST effective technique for providing security during data transmission? A. Communication log B. Systems software log C. Encryption D. Standard protocol
A company has recently upgraded its purchase system to incorporate EDI transmissions. Which of the following controls should be implemented in the EDI interface in order to provide for efficient data mapping? A. Key verification B. One-for-one checking C. Manual recalculations D. Functional acknowledgements
Which of the following BEST determines that complete encryption and authentication protocols exist for protecting information while transmitted? A. A digital signature with RSA has been implemented. B. Work is being done in tunnel mode with the nested services of AH and ESP C. Digital certificates with RSA are being used. D. Work is being done in transport mode, with the nested services of AH and ESP
Which of the following alternative business recovery strategies would be LEAST appropriate for an organization with a large database and online communications network environment? A. Hot site B. Cold site C. Reciprocal agreement D. Dual information processing facilities