Which of the following is the MOST important objective of
data protection?
A. Identifying persons who need access to information
B. Ensuring the integrity of information
C. Denying or authorizing access to the IS system
D. Monitoring logical accesses
Answer / guest
Answer: B
Maintaining data integrity is the most important objective
of data security. This is a necessity if an organization is
to continue as a viable and successful enterprise. The other
choices are important techniques for achieving the objective
of data integrity.
Is This Answer Correct ? | 8 Yes | 3 No |
The MOST significant level of effort for business continuity planning (BCP) generally is required during the: A. testing stage. B. evaluation stage. C. maintenance stage. D. early stages of planning.
The MAIN reason for requiring that all computer clocks across an organization be synchronized is to: A. prevent omission or duplication of transactions. B. ensure smooth data transition from client machines to servers. C. ensure that email messages have accurate time stamps. D. support the incident investigation process.
The corporate office of a company having branches worldwide, developed a control self-assessment program (CSA) for all its offices. Which of the following is the MOST important requirement for a successful CSA? A. Skills of the workshop facilitator B. Simplicity of the questionnaire C. Support from the audit department D. Involvement of line managers
When conducting a review of business process re-engineering, an IS auditor found that a key preventive control had been removed. In this case, the IS auditor should: A. inform management of the finding and determine if management is willing to accept the potential material risk of not having that preventing control. B. determine if a detective control has replaced the preventive control during the process and if so, not report the removal of the preventive control. C. recommend that this and all control procedures that existed before the process was reengineered be included in the new process. D. develop a continuous audit approach to monitor the effects of the removal of the preventive control.
For which of the following applications would rapid recovery be MOST crucial? A. Point-of-sale system B. Corporate planning C. Regulatory reporting D. Departmental chargeback
Which of the following is a control over component communication failure/errors? A. Restricting operator access and maintaining audit trails B. Monitoring and reviewing system engineering activity C. Providing network redundancy D. Establishing physical barriers to the data transmitted over the network
Which of the following is an output control objective? A. Maintenance of accurate batch registers B. Completeness of batch processing C. Appropriate accounting for rejections and exceptions D. Authorization of file updates
Which of the following would be a MAJOR disadvantage of using prototyping as a systems development methodology? A. User expectations of project timescales may be overly optimistic. B. Effective change control and management is impossible to implement. C. User participation in day-to-day project management may be too extensive. D. Users usually are not sufficiently knowledgeable to assist in system development.
An IS auditor needs to link his/her microcomputer to a mainframe system that uses binary synchronous data communications with block data transmission. However, the IS auditor's microcomputer, as presently configured, is capable of only asynchronous ASCII character data communications. Which of the following must be added to the IS auditor's computer to enable it to communicate with the mainframe system? A. Buffer capacity and parallel port B. Network controller and buffer capacity C. Parallel port and protocol conversion D. Protocol conversion and buffer capability
An organization has an integrated development environment (IDE), where the program libraries reside on the server, but modification/development and testing are done from PC workstations. Which of the following would be a strength of an integrated development environment? A. Controls the proliferation of multiple versions of programs B. Expands the programming resources and aids available C. Increases program and processing integrity D. Prevents valid changes from being overwritten by other changes
When reviewing a system development project at the project initiation stage, an IS auditor finds that the project team is following the organization's quality manual. To meet critical deadlines the project team proposes to fast track the validation and verification processes, commencing some elements before the previous deliverable is signed off. Under these circumstances, the IS auditor would MOST likely: A. report this as a critical finding to senior management. B. accept that different quality processes can be adopted for each project. C. report to IS management the team's failure to follow quality procedures. D. report the risks associated with fast tracking to the project steering committee.
While developing a risk-based audit program, which of the following would the IS auditor MOST likely focus on? A. Business processes B. Critical IT applications C. Corporate objectives D. Business strategies