Transmitting redundant information with each character or
frame to facilitate detection and correction of errors is
called:

A. feedback error control.

B. block sum check.

C. forward error control.

D. cyclic redundancy check.



Transmitting redundant information with each character or frame to facilitate detection and correct..

Answer / guest

Answer: C

Forward error control involves transmitting additional
redundant information with each character or frame to
facilitate detection and correction of errors. In feedback
error control, only enough additional information is
transmitted so the receiver can identify that an error has
occurred. Choices B and D are both error detection methods
but not error correction methods. Block sum check is an
extension of parity check wherein an additional set of
parity bits is computed for a block of characters. A cyclic
redundancy check is a technique wherein a single set of
check digits is generated for each frame transmitted, based
on the contents of the frame.

Is This Answer Correct ?    10 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Which of the following is a detective control? A. Physical access controls B. Segregation of duties C. Backup procedures D. Audit trails

1 Answers  


A decrease in amplitude as a signal propagates along a transmission medium is known as: A. noise. B. crosstalk. C. attenuation. D. delay distortion.

1 Answers  


Which of the following is the FIRST step in a business process reengineering (BPR) project? A. Defining the areas to be reviewed B. Developing a project plan C. Understanding the process under review D. Reengineering and streamlining the process under review

1 Answers  


When auditing a mainframe operating system, what would the IS auditor do to establish which control features are in operation? A. Examine the parameters used when the system was generated B. Discuss system parameter options with the vendor C. Evaluate the systems documentation and installation guide D. Consult the systems programmers

1 Answers  


Which of the following represents the GREATEST risk created by a reciprocal agreement for disaster recovery made between two companies? A. Developments may result in hardware and software incompatibility. B. Resources may not be available when needed. C. The recovery plan cannot be tested. D. The security infrastructures in each company may be different.

1 Answers  






Which of the following BEST describes an integrated test facility? A. A technique that enables the IS auditor to test a computer application for the purpose of verifying correct processing B. The utilization of hardware and/or software to review and test the functioning of a computer system C. A method of using special programming options to permit printout of the path through a computer program taken to process a specific transaction D. A procedure for tagging and extending transactions and master records that are used by an IS auditor for tests

1 Answers  


A control for a company that wants to prevent virus-infected programs (or other type of unauthorized modified programs) would be to: A. utilize integrity checkers. B. verify program's lengths. C. backup the source and object code. D. implement segregation of duties.

2 Answers  


Before reporting results of an audit to senior management, an IS auditor should: A. Confirm the findings with auditees. B. Prepare an executive summary and send it to auditee management. C. Define recommendations and present the findings to the audit committee. D. Obtain agreement from the auditee on findings and actions to be taken.

1 Answers   TPA,


When reviewing the quality of an IS department's development process, the IS auditor finds that they do not use any formal, documented methodology and standards. The IS auditor's MOST appropriate action would be to: A. complete the audit and report the finding. B. investigate and recommend appropriate formal standards. C. document the informal standards and test for compliance. D. withdraw and recommend a further audit when standards are implemented.

1 Answers  


The purpose of debugging programs is to: A. generate random data that can be used to test programs before implementing them. B. protect valid changes from being overwritten by other changes during programming. C. define the program development and maintenance costs to be include in the feasibility study. D. ensure that abnormal terminations and coding flaws are detected and corrected.

1 Answers  


Information requirement definitions, feasibility studies and user requirements are significant considerations when: A. defining and managing service levels. B. identifying IT solutions. C. managing changes. D. assessing internal IT control.

1 Answers  


An organization is proposing to install a single sign-on facility giving access to all systems. The organization should be aware that: A. Maximum unauthorized access would be possible if a password is disclosed. B. User access rights would be restricted by the additional security parameters. C. The security administrator?s workload would increase. D. User access rights would be increased.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)