When an organization's network is connected to an external
network in an Internet client-server model not under that
organization's control, security becomes a concern. In
providing adequate security in this environment, which of
the following assurance levels is LEAST important?

A. Server and client authentication

B. Data integrity

C. Data recovery

D. Data confidentiality

Answers were Sorted based on User's Feedback



When an organization's network is connected to an external network in an Internet client-serve..

Answer / guest

Answer: C

Data recovery, as a corrective action, occurs after a total
network failure (denial of service) and therefore is least
important in assuring security in a networked environment.
The other choices are proactive in nature and directly
impact network security. Server and client authentication
provides a way of verifying that the server bring
communicating with is a valid server, and the server needs
to know that the clients are in fact valid client machines.
Data integrity is required for verifying that the data
received over the network has not been modified during its
transmission, and data confidentiality is required for
protecting information sent over the network from eavesdropping.

Is This Answer Correct ?    8 Yes 0 No

When an organization's network is connected to an external network in an Internet client-serve..

Answer / an

C. Data recovery

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Which of the following methods of suppressing a fire in a data center is the MOST effective and environmentally friendly? A. Halon gas B. Wet-pipe sprinklers C. Dry-pipe sprinklers D. Carbon dioxide gas

1 Answers  


The extent to which data will be collected during an IS audit should be determined, based on the: A. availability of critical and required information. B. auditor's familiarity with the circumstances. C. auditee's ability to find relevant evidence. D. purpose and scope of the audit being done.

1 Answers  


The PRIMARY reason for replacing checks (cheques) with EFT systems in the accounts payable area is to: A. make the payment process more efficient. B. comply with international EFT banking standards. C. decrease the number of paper-based payment forms. D. reduce the risk of unauthorized changes to payment transactions.

1 Answers  


Which of the following is a concern when data is transmitted through secure socket layer (SSL) encryption implemented on a trading partner's server? A. Organization does not have control over encryption. B. Messages are subjected to wire tapping. C. Data might not reach the intended recipient. D. The communication may not be secure.

2 Answers  


The PRIMARY benefit of database normalization is the: A. minimization redundancy of information in tables required to satisfy users? needs. B. ability to satisfy more queries. C. maximization of database integrity by providing information in more than one table. D. minimization of response time through faster processing of information.

2 Answers  






Which of the following is a measure of the size of an information system based on the number and complexity of a system's inputs, outputs and files? A. Program evaluation review technique (PERT) B. Rapid application development (RAD) C. Function point analysis (FPA) D. Critical path method (CPM)

1 Answers  


Which of the following independent duties is traditionally performed by the data control group? A. Access to data B. Authorization tables C. Custody of assets D. Reconciliation

1 Answers  


The difference between whitebox testing and blackbox testing is that whitebox testing: A. involves the IS auditor. B. is performed by an independent programmer team. C. examines a program's internal logical structure. D. uses the bottom-up approach.

1 Answers  


A tax calculation program maintains several hundred tax rates. The BEST control to ensure that tax rates entered into the program are accurate is: A. an independent review of the transaction listing. B. a programmed edit check to prevent entry of invalid data. C. programmed reasonableness checks with 20 percent data entry range. D. a visual verification of data entered by the processing department.

1 Answers  


The most common reason for the failure of information systems to meet the needs of users is that: A. user needs are constantly changing. B. the growth of user requirements was forecast inaccurately. C. the hardware system limits the number of concurrent users. D. user participation in defining the system's requirements was inadequate.

1 Answers  


Which of the following data entry controls provides the GREATEST assurance that the data is entered correctly? A. Using key verification B. Segregating the data entry function from data entry verification C. Maintaining a log/record detailing the time, date, employee's initials/user id and progress of various data preparation and verification tasks D. Adding check digits

1 Answers  


When reviewing a system development project an IS auditor would be PRIMARILY concerned with whether: A. business objectives are achieved. B. security and control procedures are adequate. C. the system utilizes the strategic technical infrastructure. D. development will comply with the approved quality management processes

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)